Em Hachita - Jerusalem

Planing, delivery, installation and commissioning of a new kosher wheat mill with a daily production of 200t/24h.

 commissioning:

september 2016

Bruckmühle im Ries - Nördlingen

Installation of a new milling system with a daily production of 100t/24h in an existing building.

comissioning:

September 2014

Straubmühle

Installation of a new milling system with a daily production of 60t/24h into an existing building.

comissioning: 

May 2014

Hedwigsburger Okermühle GmbH

Modernisation and an increase of the efficiency of the exisiting cleaning system up to 35t/h

Comissioning:

November 2011

Bruckmühle im Ries - Nördlingen

Installtion and integration of 2 roller mills in an existing milling system.

comissioning:

April 2011

Ammerndorfer Mühle - 60t/24h

Installation of a new milling system with a daily production of 80t/24h wheat and 50t/24h rye in an existing building.

Comissioning:

September 2010

Cerealien Bischheim/ Kupfermühle

The Mühlenbautechnik Bruckmann GmbH assumed the complete planing, calculation and the drafting production for the planned Alteration of the mill as well as the connection of the flour conveying to the existing Silos and plant components.

Also the calculation and coordination of:

-the mill pneumatic

-the pneumatic pressure conveying of the end-product

-the roller mill gears

-the  floor chart

 

Frießinger Mühle

Mühlenbautechnik Bruckmann Gmbh assumed the engineering, the calculation and delivery of diverse conveying, silo- and millingtechnical plants since 1996.

 

Tartu Veski

The Mühlenbautechnik Bruckmann GmbH assumed the complete planing, calculation and the drafting production for the planned Alteration of the mill as well as the connection of the flour conveying to the existing Silos and plant components.

Also the calculation and coordination of:

-the mill pneumatic

-the pneumatic pressure conveying of the end-product

-the roller mill gears

-the  floor chart