Magdeburger Mühlenwerke - 1st and 2nd cleaning

Planning, delivery and installation of the first and second cleaning for 24 t/h wheat.

Also the transport from the grain silos to the new cleaning has been realised.

The specialty about this is the pneumatic transport for 24 t/h wheat with an total length of around 80 meters.

 

Commissioing: March 2021

Ottenmühle - Engineering of a new combined milling system

Mühlenbautechnik Bruckmann GmbH did the whole engineering of the new combined milling system. One system for wheat with a capacity of 120t/d and one system for wheat/rye with a capacity of 65/50/d. The customer bought the machinery directly from Bühler.

Em Hachita bakery - Jerusalem

Modernisation of the existing, kosher stone mill with a capacity of 2t/h.

Because of religiously reasons, the company produces besides the new 200t/d mill also flour on traditional stone mills.

The following components were modernised:

- pneumatic conveying lines

- 2 stone mills

- by-product-handling

- Aspiration

Also, three new bakery silos with a fluidisation bottom have been installed.

comissioning: Feburary 2017

 

 

Em Hachita - Jerusalem

Planing, delivery, installation and commissioning of a new kosher wheat mill with a daily production of 200t/24h.

 commissioning:

september 2016

Bruckmühle im Ries - Nördlingen

Installation of a new milling system with a daily production of 100t/24h in an existing building.

comissioning:

September 2014

A/S Dobeles Dzirnavnieks - Lettland

Planning, projection and delivery of an oat flakes and muesli production line.

Commissioning: 2015

Straubmühle

Installation of a new milling system with a daily production of 60t/24h into an existing building.

comissioning: 

May 2014

Hedwigsburger Okermühle GmbH

Modernisation and an increase of the efficiency of the exisiting cleaning system up to 35t/h

Comissioning:

November 2011

Bruckmühle im Ries - Nördlingen

Installtion and integration of 2 roller mills in an existing milling system.

comissioning:

April 2011

Ammerndorfer Mühle - 60t/24h

Installation of a new milling system with a daily production of 80t/24h wheat and 50t/24h rye in an existing building.

Comissioning:

September 2010

A/S Dobeles Dzirnavnieks - Lettland

Planning, projection and delivery of a complete 400t/d milling system for wheat.

Commissioning: 2010

Tartu Veski

The Mühlenbautechnik Bruckmann GmbH assumed the complete planing, calculation and the drafting production for the planned Alteration of the mill as well as the connection of the flour conveying to the existing Silos and plant components.

Also the calculation and coordination of:

-the mill pneumatic

-the pneumatic pressure conveying of the end-product

-the roller mill gears

-the  floor chart

Cerealien Bischheim/ Kupfermühle

The Mühlenbautechnik Bruckmann GmbH assumed the complete planing, calculation and the drafting production for the planned Alteration of the mill as well as the connection of the flour conveying to the existing Silos and plant components.

Also the calculation and coordination of:

-the mill pneumatic

-the pneumatic pressure conveying of the end-product

-the roller mill gears

-the  floor chart

 

Links & Downloads

Frießinger Mühle

Mühlenbautechnik Bruckmann Gmbh assumed the engineering, the calculation and delivery of diverse conveying, silo- and millingtechnical plants since 1996.