Gebr. Engelke - Modernisierung einer Mehlverladung
Modernisation of the flour loading.
Planing, delivery and installation of 7 loading chutes.
comissioning: january 2017
Dagan Flour Mill Israel - Bran loading
Planning, delivery and installation of two multiple-screw-conveyors for the unloading of bran, with a capacity of 50 t/h.
The two bran silos had no discharge device, so the hoppers have been cut, and the two multiple-screw-conveyors could be installed.
Commissioning: September 2019
Heigl Kartoffelveredelungs GmbH - GRP-Silo
Planning, delivery, installation and commissioning of one GRP-Silo for Potatostarch, incl. the pneumatic transport into a weighing bin.
Commissioning: september 2019
Gebr. Engelke - modernisation of a flour loading
Modernisation of the flour loading.
Planing, delivery and installation of 7 loading chutes.
comissioning: january 2017
bakery Bachmeier
Planing, delivery and installation of four GFK-flour silos with 100m³ capacity per silo as well as two flour scales.
speciality: single-box plansifter directly before the mixing tank.
commissioning: october 2016
Ammerndorfer Mühle
Delivery of 8 smooth wall silos. 4 silos with 20m³ capacity per silo and 4 silos with 14m³ capacity used as tempering bins.
comissioning: July 2015
Hoch Oblaten - loading silos
Planing, delivery and installation of 2 loading silos.
Loading by means of air fluidisation and loading chutes.
comissioning: april 2015
Litz Mühle - flour loading silos
Planing, delivery and installation of 4 flour loading silos
comissioning: october 2013
Richard Anton KG
Delivery of 28 Aluminium silos for graphit as well as the aspiration and the pneumatic charging of the silos. Also the pneumatic pressure conveying plant for 12t/h with a conveying length of 140m, the sifting plant with 2 quadrat plansifters with 95m² total sifting surface per plansifter as well as the pneumatic conveying of the semi-finished goods.
comissioning:
Februar 2013
Enzweihinger Mühle - Flourloading
In addition to the two already existing GFK-Silos, 6 new GFK-Silos with a capacity of 11 tons flour were delivered and mounted on a steel structure. The entire silo-system was completely covered after mounting it. The loading occurs by means of screw conveyors and a loading chute with a power of 25 t/h
commissioning:
November 2012
Neudorff
Planning, delivery and installation of several siloplants at different Neudorff locations.
2001:
-delivery of an aluminium silo
2006:
-delivery of two chalksilos
2008:
-delivery of an aluminium silo in Emmerthal
-delivery of an aluminium silo in Lüneburg
2010:
-delivery of another aluminium silo in Emmerthal
2011:
-delivery of another aluminium silo in Lüneburg
Ottenmühle
Delivery of 2 quadratic silos.
comissioning:
January 2011
Thylmann
Engineering, delivery and installation of the mechanic equpicment for the new biulding of a flour silo with 9 concrete cells with a total capacity of 2000 t. flour and a charge-mixing-plant for 20t/h with a 4000 l. mixer. Completly with pneumatic charging, aspiration, unloading, controll-sieving and automatic sample taking.
commisioning:
Feburar 2008
Ammerndorfer Mühle
Delivery of 7 aluminium silos for the storage of flour. The discharging is carried out by means of vibro discharger and rotary valves, the conveying of the flour by means of an pneumatic pressure plant. The loading of the product is carried out by means of an tubular screw conveyor.
comissioning:
June 2004
Wesermühle
The Flour-unloading-plant consists of 28 silos for wheat-, rhy- and corngrindingproducts and a plant for the production of special flour receps by means of a mixer. The back lane of the unloading plant is designated for one-chamber-silocars. A weighbridge regulates die amount of the discharged flour. The front lane of the unloading part is for multiple-chamber-silocars which can be load with different flour sorts. This is carried out by an displaceable scale, which approaches the silos programm-controlled to unload the designated silo. The automatic and hygienic unloadingprocess of 25 tons lasts between 10 and 30 minutes.
comissioning:
September 2003
Störrmühle
Planning, delivery and installation of 4 aluminium silos and the loading by means of 4 screw conveyors.
comissioning:
Juli 2001
Tartu Veski
Engineering, delivery and installation of 6 stealcells with 63m³ per cell as well as the unloading by means of tubular screw conveyors.